It’s hard to see from these photos but things have changed pretty dramatically in the last 2 months. Besides building , delivering and installing the septic tanks and getting all the Well Drilling equipment into place, excavation is almost done!!
What does that mean? Because of the slope of the property (being on the skirt of the Agua Volcano), levels have had to be created. Platforms for each home and building are now done!!
So we are all leveled up now at Casa de Gracia and ready to begin construction on the first Transition Home and hopefully soon, the Trade School! Stay Tuned for all that is coming