With all the Permits in place and Funding coming in, construction is underway and we couldn’t be more excited about it!
So far it is primarily excavation work to prep for the well drilling rigs to be able to arrive and beginning excavation for the first Transition Home to be able to begin being built in December 🙌🏼🙌🏼
The other work currently being done is preparing the giant hole and cement casing for the Septic tank to be installed as soon as it’s finished being built at the factory.
The final items of work have been the raising of the wall in a few critical areas of the property.
As November approaches, more and more excavation can be done as our dry season arrives.
We can’t wait to see the property begin taking its new shape!
We are also so anxious for the well drilling equipment to arrive and begin drilling as well as the installation of the septic system!
Also, after having the Redeemed Steel crews on site during this last month of October, we are beyond excited for excavation to be done for the trade school! That will be one of the next buildings to be built along with the Transition Home 🙌🏼
So lots of excitement even though we are really just getting started! Here we Go!!